{"id":1442,"date":"2019-11-28T15:44:25","date_gmt":"2019-11-28T15:44:25","guid":{"rendered":"http:\/\/aspiredefence.co.uk\/adcw\/?p=1442"},"modified":"2019-11-28T15:44:25","modified_gmt":"2019-11-28T15:44:25","slug":"new-physical-recreational-training-facility-for-royal-engineers","status":"publish","type":"post","link":"https:\/\/aspiredefence.co.uk\/adcw\/new-physical-recreational-training-facility-for-royal-engineers\/","title":{"rendered":"New Physical &amp; Recreational Training Facility for Royal Engineers"},"content":{"rendered":"<h2><strong>State-of-the-art sports centre supports soldiers\u2019 health &amp; fitness<\/strong><\/h2>\n<p>Royal Engineers at Perham Down are benefitting from a new Physical &amp; Recreational Training Facility (P&amp;RTF).<\/p>\n<p>The building, which has a gym, sports hall, squash courts and outdoor all-weather pitch, represents the 100th \u2018major asset\u2019 completed by\u00a0<a href=\"https:\/\/aspiredefence.co.uk\/adcw\/\">Aspire Defence Capital Works<\/a>\u00a0for the\u00a0<a href=\"https:\/\/aspiredefence.co.uk\/project-allenby-connaught\/army-basing-programme\/\">Army Basing Programme (ABP).<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1440\" src=\"http:\/\/aspiredefence.co.uk\/adcw\/wp-content\/uploads\/sites\/2\/2019\/11\/Aspire-Perham-19100461-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" srcset=\"https:\/\/aspiredefence.co.uk\/adcw\/wp-content\/uploads\/sites\/2\/2019\/11\/Aspire-Perham-19100461-scaled.jpg 2560w, https:\/\/aspiredefence.co.uk\/adcw\/wp-content\/uploads\/sites\/2\/2019\/11\/Aspire-Perham-19100461-768x512.jpg 768w, https:\/\/aspiredefence.co.uk\/adcw\/wp-content\/uploads\/sites\/2\/2019\/11\/Aspire-Perham-19100461-1536x1024.jpg 1536w, https:\/\/aspiredefence.co.uk\/adcw\/wp-content\/uploads\/sites\/2\/2019\/11\/Aspire-Perham-19100461-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><\/p>\n<p>Under the ABP, around 4,000 Service personnel returned from Germany during summer 2019 alongside numerous Unit moves within the UK. The programme has required significant construction, expansion and demolition of garrison infrastructure, including the creation of some 2,400 bed spaces across Salisbury Plain Training Area (SPTA) and at Aldershot.<\/p>\n<p>Around 130 new buildings will be delivered by summer 2020 for SPTA and Aldershot, including healthcare and early years education facilities to benefit soldiers and Service families in Larkhill, Bulford and Tidworth.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"box match-height-row-item animation-element slide-left bg-lblue\">\n    <div class=\"image\">\n        <img decoding=\"async\" src=\"https:\/\/aspiredefence.co.uk\/adcw\/wp-content\/uploads\/sites\/2\/2019\/08\/Capability-Construction-Management.png\" alt=\"\"  \/>\n    <\/div>\n    <div class=\"content\">\n        <h2>ADCW's Key Capabilities<\/h2>\n                <p>\n            <a class=\"btn white-border transparent btn-xlg btn-chev\" href=\"https:\/\/aspiredefence.co.uk\/adcw\/capabilities-news\/\">Discover more here..<\/a>\n        <\/p>\n    <\/div>\n    <div class=\"clearfix\"><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>State-of-the-art sports centre supports soldiers\u2019 health &amp; fitness Royal Engineers at Perham Down are benefitting from a new Physical &amp; Recreational Training Facility (P&amp;RTF). The building, which has a gym, sports hall, squash courts and outdoor all-weather pitch, represents the 100th \u2018major asset\u2019 completed by\u00a0Aspire Defence Capital Works\u00a0for the\u00a0Army Basing Programme (ABP). Under the ABP, [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":1441,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1442","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-adcw-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/aspiredefence.co.uk\/adcw\/wp-json\/wp\/v2\/posts\/1442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aspiredefence.co.uk\/adcw\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aspiredefence.co.uk\/adcw\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aspiredefence.co.uk\/adcw\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/aspiredefence.co.uk\/adcw\/wp-json\/wp\/v2\/comments?post=1442"}],"version-history":[{"count":1,"href":"https:\/\/aspiredefence.co.uk\/adcw\/wp-json\/wp\/v2\/posts\/1442\/revisions"}],"predecessor-version":[{"id":1443,"href":"https:\/\/aspiredefence.co.uk\/adcw\/wp-json\/wp\/v2\/posts\/1442\/revisions\/1443"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aspiredefence.co.uk\/adcw\/wp-json\/wp\/v2\/media\/1441"}],"wp:attachment":[{"href":"https:\/\/aspiredefence.co.uk\/adcw\/wp-json\/wp\/v2\/media?parent=1442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aspiredefence.co.uk\/adcw\/wp-json\/wp\/v2\/categories?post=1442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aspiredefence.co.uk\/adcw\/wp-json\/wp\/v2\/tags?post=1442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}