{"id":3202,"date":"2019-04-01T13:03:58","date_gmt":"2019-04-01T13:03:58","guid":{"rendered":"https:\/\/aspiredefence.co.uk\/adsl\/?p=3202"},"modified":"2019-04-01T13:06:27","modified_gmt":"2019-04-01T13:06:27","slug":"435k-resurfacing-works-improve-major-military-route-in-aldershot","status":"publish","type":"post","link":"https:\/\/aspiredefence.co.uk\/adsl\/435k-resurfacing-works-improve-major-military-route-in-aldershot\/","title":{"rendered":"\u00a3435k resurfacing works improve major military route in Aldershot"},"content":{"rendered":"<h1><strong><span style=\"font-family: 'Arial',sans-serif;font-size: 12pt\"><span style=\"color: #000000\">Major resurfacing works costing nearly half a million<\/span><\/span> <span style=\"font-family: 'Arial',sans-serif;font-size: 12pt\"><span style=\"color: #000000\">pounds<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 12pt\"><span style=\"color: #000000\"> and completed in just ten days have transformed an iconic military road in Aldershot.<\/span><\/span><\/strong><\/h1>\n<p><span style=\"font-family: 'Arial',sans-serif\"><span style=\"color: #000000;font-size: medium\">Around three quarters of a mile of road has been resurfaced along Queen\u2019s Avenue, with a team of twenty contractors working around the clock to get the route reopened as quickly as possible last week. <\/span><\/span><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif\"><span style=\"color: #000000;font-size: medium\">As the connecting road between the North and South areas of the Garrison, Queen\u2019s Avenue is an important route for Army vehicles, passing by Aldershot\u2019s Military Museum and the Army\u2019s Montgomery House. <\/span><\/span><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif\"><span style=\"color: #000000;font-size: medium\">The works, which began on Saturday 16 March and completed on Thursday 28 March, represent an investment of around \u00a3435k towards improving Aldershot\u2019s infrastructure. It is the largest highways scheme to be carried out to date by Aspire Defence Services Limited (ADSL), (contracting to Aggregate Industries), under the Project Allenby\/Connaught contract with the MOD which began in 2006. <\/span><\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-3205\" src=\"https:\/\/aspiredefence.co.uk\/adsl\/wp-content\/uploads\/sites\/3\/2019\/04\/Queens-Avenue-BEFORE.jpg\" alt=\"\" width=\"1512\" height=\"2016\" srcset=\"https:\/\/aspiredefence.co.uk\/adsl\/wp-content\/uploads\/sites\/3\/2019\/04\/Queens-Avenue-BEFORE.jpg 1512w, https:\/\/aspiredefence.co.uk\/adsl\/wp-content\/uploads\/sites\/3\/2019\/04\/Queens-Avenue-BEFORE-768x1024.jpg 768w\" sizes=\"auto, (max-width: 1512px) 100vw, 1512px\" \/><\/p>\n<p class=\"wp-caption-text\">Queen\u2019s Avenue before resurfacing<\/p>\n<p>\u00a0<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-3207\" src=\"https:\/\/aspiredefence.co.uk\/adsl\/wp-content\/uploads\/sites\/3\/2019\/04\/Queens-Avenue-AFTER.jpg\" alt=\"\" width=\"1512\" height=\"2016\" srcset=\"https:\/\/aspiredefence.co.uk\/adsl\/wp-content\/uploads\/sites\/3\/2019\/04\/Queens-Avenue-AFTER.jpg 1512w, https:\/\/aspiredefence.co.uk\/adsl\/wp-content\/uploads\/sites\/3\/2019\/04\/Queens-Avenue-AFTER-768x1024.jpg 768w\" sizes=\"auto, (max-width: 1512px) 100vw, 1512px\" \/><\/p>\n<p class=\"wp-caption-text\">Queen\u2019s Avenue after resurfacing<\/p>\n<p><span style=\"font-size: medium\"><span style=\"color: #000000\"><b><span style=\"font-family: 'Arial',sans-serif\">More than 800 metal fence panels<\/span><\/b><span style=\"font-family: 'Arial',sans-serif\"> were installed to safeguard passing pedestrians from site and special plant machinery was purchased in order to deliver the project on time and to the required high standard. The works, which involved operation of <b>ten lorries making 13 visits<\/b>, included removal of potholes, improved drainage to prevent \u2018ponding\u2019 and installation of two traffic light-controlled crossings using latest digital technology. <\/span><\/span><\/span><\/p>\n<p><span style=\"font-size: medium\"><span style=\"color: #000000\"><b><span style=\"font-family: 'Arial',sans-serif\">In excess of 1250 tonnes of road surface<\/span><\/b><span style=\"font-family: 'Arial',sans-serif\"> have been planed off for reuse and recycling, replaced with state-of-the-art Superflex material. <b>Over 5 miles of new lining<\/b>, centre markings and hatchings have been painted. Kerbs and pathways were renewed last year. <\/span><\/span><\/span><\/p>\n<p><b><span style=\"font-family: 'Arial',sans-serif\"><span style=\"color: #000000;font-size: medium\">Mark Bassett, Programme Manager (ADSL), said:<\/span><\/span><\/b><\/p>\n<p><b><span style=\"font-family: 'Arial',sans-serif\"><span style=\"color: #000000;font-size: medium\">\u201cThe new road surface will last for the remaining two decades of the PAC contract, so this project not only delivers aesthetic improvement and a much smoother ride for military and local drivers, it also represents excellent long-term value for money for the MOD.\u201d<\/span><\/span><\/b><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif\"><span style=\"color: #000000;font-size: medium\">The programme of works has required extensive advance planning and collaboration with local authorities, emergency services, utilities companies and the Garrison, to ensure diversions were in place and that access into Aldershot camps was maintained for Service personnel via alternate gates. A leaflet drop was also carried out to keep residents of Service Families Accommodation at Blenheim Park informed.\u00a0 <\/span><\/span><\/p>\n<p><b><span style=\"font-family: 'Arial',sans-serif\"><span style=\"color: #000000;font-size: medium\">Mark Furnival, Assistant Head of PAC (Defence Infrastructure Organisation), said: <\/span><\/span><\/b><\/p>\n<p><b><span style=\"font-family: 'Arial',sans-serif\"><span style=\"color: #000000;font-size: medium\">\u201cIt is testament to the successful collaborative relationships at all levels of this Project that these works were completed within such a short timescale. This is an excellent example of our commitment to delivering a better defence estate for the British Army in Aldershot.\u201d<\/span><\/span><\/b><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 12pt\"><span style=\"color: #000000\">\u00a0<\/span><\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Major resurfacing works costing nearly half a million pounds and completed in just ten days have transformed an iconic military road in Aldershot. Around three quarters of a mile of road has been resurfaced along Queen\u2019s Avenue, with a team of twenty contractors working around the clock to get the route reopened as quickly as [&hellip;]<\/p>\n","protected":false},"author":23,"featured_media":3204,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3202","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-services-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/aspiredefence.co.uk\/adsl\/wp-json\/wp\/v2\/posts\/3202","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aspiredefence.co.uk\/adsl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aspiredefence.co.uk\/adsl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aspiredefence.co.uk\/adsl\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/aspiredefence.co.uk\/adsl\/wp-json\/wp\/v2\/comments?post=3202"}],"version-history":[{"count":3,"href":"https:\/\/aspiredefence.co.uk\/adsl\/wp-json\/wp\/v2\/posts\/3202\/revisions"}],"predecessor-version":[{"id":3210,"href":"https:\/\/aspiredefence.co.uk\/adsl\/wp-json\/wp\/v2\/posts\/3202\/revisions\/3210"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aspiredefence.co.uk\/adsl\/wp-json\/wp\/v2\/media\/3204"}],"wp:attachment":[{"href":"https:\/\/aspiredefence.co.uk\/adsl\/wp-json\/wp\/v2\/media?parent=3202"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aspiredefence.co.uk\/adsl\/wp-json\/wp\/v2\/categories?post=3202"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aspiredefence.co.uk\/adsl\/wp-json\/wp\/v2\/tags?post=3202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}